Calculate the price
of
your order:

275 words
+
Approximate price
$ 0.00

 Project Details: The new building includes the IT Area, Computer Labs, Administrative Areas, Individual  Offices, a Conference Room, and a Public Meeting Room. IT Area: resources include • 4 network servers • 1 desktop PC • 2 laptops • 2 VOIP phones Administrative Areas: 2 administrative areas will each have • 4 workstations, each with a desktop PC, networked via a network port • a VOIP phone for each of the 4 workstations • a vendor-supplied networked copier Conference Room. The conference room has • a wireless ceiling-mounted Projector • network connectivity via a network cable and a wireless access point • a VOIP phone Meeting Room. The meeting room has • a wireless ceiling-mounted Projector • 1 desktop PC with network connectivity via a network cable. • 2 VOIP phones (one near the lectern and the other wall mounted at the entrance Individual Offices: 40 offices will each have • a desktop PC networked via a network port • a VOIP phone Computer Labs: 2 computer labs will each have • a wireless ceiling-mounted Projector • a desktop PC, networked via a network port, and directly cabled to the Projector • 25 desktop PCs networked via a network port  • a VOIP phone • a vendor-supplied networked copier Personnel Assignments PC Specialist (equipment purchase, software setup and PC support): o purchase, setup and installation of new laptops and desktop computers and corporate software o purchase of all projectors o work with Network Specialist to ensure network access is available on all computers and  networked printers Network Specialist (Telecomm support): o setup and installation of network servers and all VOIP phones o work with PC Specialist to ensure network access is available on all computers and networked  printers AV Specialist (A/V requirements): o Installation of all wireless projectors  o work with PC Specialist to ensure projectors can be accessed by appropriate computers Take time to think about how the work of the Specialists will be conducted.  • Understand how the occupancy rules affect the schedule timeline. o Since some locations are occupied at different times, handle the deployment and testing of  resources for each location separately (i.e. IT Area separate from Admin Area; Conference Room,  Meeting Room, etc.). • Make sure you satisfy all project specifications.  • The PC Specialist, Network Specialist and AV Specialist can be completing tasks concurrently and it is quite  possible that one specialist will have to wait while another specialist completes a task.  • The schedule must include a milestone for each block of tasks (Purchase Resources, Setup Equipment,  Deploy and Test). o Each resource (network servers, computers, projectors) must be purchased separately since  they will come from different vendors. The VOIP phones and third-party network printers are  already ordered and just need to be tested once they arrive. o Note: a single task may be used for a resource that is tested at a specific time (i.e. the testing of  all computers for administrative areas can be a single task; or the testing of all computer for the  2 computer labs can be a single task). However, a single task cannot be used when an action  must be done during different occupancy periods (i.e., testing of IT Area resources is a separate  task from testing of Administrative Areas, etc. since they take occupancy at different times.) • Task Actions must start with a verb and describe the action (i.e., Test VOIP phones)  o Milestones do not start with verbs and have a zero duration. • When creating the schedule, use your best guess in determining Duration. Use a single measure (i.e.,  min.) for all tasks. • Resources must include both the people (title of the IT Specialist) and specific resource(s).  • When creating Predecessors, point to the respective Task # (not the WBS number). It is not necessary  to include a task that is already a predecessor of another task (i.e. consider the following tasks: 1:  Order food, 2: Eat food, 3: Cleanup. The predecessor for 2 is 1. The predecessor for 3 is 2 (i.e. 2  already has a predecessor of 1). o Note: be careful about predecessors. Not only are they directly related to the tasks that  proceed them within a Milestone but they may be directly related to tasks within other  Milestones (example: network servers must be operational before other equipment can be  tested for network connectivity – look for other dependencies described above) 

Basic features

  • Free title page and bibliography
  • Unlimited revisions
  • Plagiarism-free guarantee
  • Money-back guarantee
  • 24/7 support

On-demand options

  • Writer's samples
  • Part-by-part delivery
  • Overnight delivery
  • Copies of used sources
  • Expert Proofreading

Paper format

  • 275 words per page
  • 12pt Arial/Times New Roman
  • Double line spacing
  • Any citation style (APA, MLA, CHicago/Turabian, Havard)

Guaranteed originality

We guarantee 0% plagiarism! Our orders are custom made from scratch. Our team is dedicated to providing you academic papers with zero traces of plagiarism.

Affordable prices

We know how hard it is to pay the bills while being in college, which is why our rates are extremely affordable and within your budget. You will not find any other company that provides the same quality of work for such affordable prices.

Best experts

Our writer are the crème de la crème of the essay writing industry. They are highly qualified in their field of expertise and have extensive experience when it comes to research papers, term essays or any other academic assignment that you may be given!

Calculate the price of your order

You will get a personal manager and a discount.
We'll send you the first draft for approval by at
Total price:
$0.00

Expert paper writers are just a few clicks away

Place an order in 3 easy steps. Takes less than 5 mins.